Start with the selected configuration
Shipping dimensions and handling depend on the model and its delivery form. A completed cabin and an assembly-based modular system require different plans.
Review the whole route
Include port access, road width, bends, overhead restrictions and the site entrance. A final site photograph and access sketch help identify constraints early.
Prepare for unloading
Agree who arranges lifting equipment, receiving labour and secure staging. The required equipment must suit the shipment weight, lifting points and ground conditions.
Define the trade and delivery scope
Confirm the quotation currency, Incoterm, named port or place, packaging, insurance and unloading responsibilities. Include transport documentation in the order checklist.