# Shipping Cabins: Route and Site Access

Source: https://space.chinafactorysupplier.com/resources/shipping-and-site-access/

Language: en

Published: 2026-10-21T16:54:54.510Z

Updated: 2026-10-21T16:54:54.510Z

Plan the journey from production to the final position on site.

![MG8-27 Modular House exterior design](https://space.chinafactorysupplier.com/media/modules-x00489.webp)

## Start with the selected configuration

Source section: https://space.chinafactorysupplier.com/resources/shipping-and-site-access/#detail-1

Shipping dimensions and handling depend on the model and its delivery form. A completed cabin and an assembly-based modular system require different plans.

## Review the whole route

Source section: https://space.chinafactorysupplier.com/resources/shipping-and-site-access/#detail-2

Include port access, road width, bends, overhead restrictions and the site entrance. A final site photograph and access sketch help identify constraints early.

## Prepare for unloading

Source section: https://space.chinafactorysupplier.com/resources/shipping-and-site-access/#detail-3

Agree who arranges lifting equipment, receiving labour and secure staging. The required equipment must suit the shipment weight, lifting points and ground conditions.

## Define the trade and delivery scope

Source section: https://space.chinafactorysupplier.com/resources/shipping-and-site-access/#detail-4

Confirm the quotation currency, Incoterm, named port or place, packaging, insurance and unloading responsibilities. Include transport documentation in the order checklist.

## Bring your project into focus

Tell us your destination, intended use and number of units. We will help you select a layout and plan the next steps.